Supported by a £12M grant and international partnerships, our lead-acid battery-electrolyser has achieved over99% hydrogen purity.

Hydrogen produced during electrolysis is collected and compressed to 4.7 bar for storage in an underground tank made from plastic pipe, typically used for natural gas – making further use of low-cost, abundant materials. Hydrogen can then be used as a fuel source, eg combustion for clean cooking.
This containerised unit integrates:
- • 160 cells (2 V, 64 Ah) engineered in partnership with Monbat, providing 20.48 kWh of capacity (10.24 kWh usable at 50% DoD)
- Hydrogen production up to 19 L/min during overcharge, stored at 4.7 bar in a compression and storage system engineered for safety and efficiency
- 3.91 kg hydrogen capacity, equating to 130.4 kWh (LHV) – supporting 8 days of communal cooking with a 5.5 kW burner for 3 hours/day
- Electrolysis efficiency of 72% and charge/discharge efficiency of 80%, supported by an advanced safety and control electronics system
- A bespoke battery management system with remote monitoring and load-matching algorithms
The cells utilise only standard lead-acid components – tubular positive plates, flat negative plates, and custom-designed polypropylene lids with dedicated ports for hydrogen collection and oxygen venting. Our ABS gas separator prevents cross-contamination, delivering over 99% hydrogen purity.



The technology is being scaled at Loughborough University Science and Enterprise Park, as part of the Zero Carbon Innovation Centre, supported by East Midlands Freeport (EMF).
Internationally, the system is being deployed at Mwanza District Hospital in Malawi, where it provides reliable solar energy for lighting, refrigeration, and medical equipment, funded by the Innovate UK MESCH project. It has arrived in Malawi in October 2025 and is being commissioned.
A further unit will be shipped to Zambia, as part of Horizon Europe LoCEL-H2 project.
Two more units are under construction including the EMF funded demonstrator to be located at Loughborough.
October 2025 Malawi installation photos from left:
Test unit installed on concrete base (with Soustain Chigalu, EnerHy PhD researcher), Excavation for the hydrogen storage, Plastic pipes added to storage pit.